FORTESCUE BALANCE OF PLANT EIC INSTALLATION
I&C is involved in the development of an electrolyser manufacturing facility located in Aldoga QLD. The electrolyser shall recieve electrolyser components and assemble them to produce electrolysers with production of 2 GW of PEM electrolysers per annum.
The associated BOP which key systems including cooled and chilled water, nitrogen gas, instrument air, de-ionised water, hydrogen, oxygen and nitrogen venting and process water drainage to fabrication and testing part of the Fortescue facility. The BOP will provide shared services of nitrogen and de-ionised water back to the Electrolyser.
For I&C, this scope included all works necessary for the installation and construction verification for Electrical, Instrumentation and Controls equipment required for the BOP.
 
                         
                   
                   
                  